Tunneling

BRUSHY CREEK PHASE 2 RAW WATER DELIVERY SYSTEM

Austin, TX

SOLVED

The project consists of a Raw Water Intake with two lake taps with multi-level intake screens that connect to a gravity Raw Water Intake Tunnel that transports water to a new 145-Million Gallons per Day (MGD) Raw Water Pump Station. The Raw Water Transmission Tunnel and Pipeline will transport the pumped water to the existing Cedar Park, Sandy Creek, and BCRUA water treatment plants. A Maintenance Building will also be constructed to house chemical feed systems to protect the infrastructure from invasive species and provide quality improvements to the raw water prior to pumping. The project is funded by the BCRUA, its customer cities, and in collaboration with the Texas Water Development Board.